Site Feasibility Assessment
A single-location audit determining whether a proposed facility can support mining hardware at 0.05 TH/s and above without thermal or electrical failure.
Assessment Areas
Our engineer visits the proposed site and documents:
- Available amperage at the main panel and sub-panel locations
- Ceiling height, floor load rating, and existing ventilation infrastructure
- Ambient temperature range across seasons using data loggers left for 72 hours
- Distance to nearest transformer and cable run feasibility
- Local zoning or noise restrictions relevant to continuous fan operation
Outcome
You receive a feasibility memo stating whether the site can support your target hashrate, what modifications are required, and an estimated cost range for those modifications (provided as guidance, not a contractor quote).
When to Request This
Before signing a lease or purchasing hardware for a new location. Several clients have used this assessment to renegotiate lease terms after discovering inadequate cooling infrastructure.