Site Feasibility Assessment

A single-location audit determining whether a proposed facility can support mining hardware at 0.05 TH/s and above without thermal or electrical failure.

Site Feasibility Assessment
FormatOn-site inspection + feasibility memo
Duration1–2 weeks
LocationOn-site at your proposed facility in South Korea
Pricing₩2,400,000 per site

Assessment Areas

Our engineer visits the proposed site and documents:

  • Available amperage at the main panel and sub-panel locations
  • Ceiling height, floor load rating, and existing ventilation infrastructure
  • Ambient temperature range across seasons using data loggers left for 72 hours
  • Distance to nearest transformer and cable run feasibility
  • Local zoning or noise restrictions relevant to continuous fan operation

Outcome

You receive a feasibility memo stating whether the site can support your target hashrate, what modifications are required, and an estimated cost range for those modifications (provided as guidance, not a contractor quote).

When to Request This

Before signing a lease or purchasing hardware for a new location. Several clients have used this assessment to renegotiate lease terms after discovering inadequate cooling infrastructure.

Request a Quote