Multi-Site Deployment Planning
A structured planning engagement for operators spreading mining capacity across two or more locations, covering power contracts, cooling layouts, and hardware allocation.
Who This Is For
Operators who have secured or are negotiating grid connections at multiple warehouses, converted industrial buildings, or rural facilities and need a coherent plan for distributing mining hardware without overloading any single site.
What You Receive
A written deployment report covering:
- Hashrate allocation per site based on available amperage and cooling capacity
- Recommended miner models from our reviewed catalogue (0.05 TH/s minimum)
- Rack layout diagrams with airflow direction marked
- Relocation sequence if you plan to move units between sites seasonally
- Risk notes on humidity, dust, and local noise ordinances
What Is Excluded
We do not procure hardware, negotiate utility contracts, or perform electrical installation. Our role ends at the planning document and follow-up clarifications within 30 days of delivery.
Process
- Intake call — You share site addresses, current or planned power capacity, and target hashrate.
- Site visits — Our engineer inspects each location for ventilation, floor load, and cable routing.
- Hardware matching — We cross-reference your budget and power limits against reviewed equipment.
- Report delivery — You receive a PDF deployment plan with annotated floor plans.
Preparation
Gather recent electricity bills, floor plans (even hand-drawn), and a list of hardware you already own or intend to purchase. If sites are under construction, provide the expected completion date for each.
Next Step
Submit a brief through our contact form describing your site count and target hashrate. We schedule an intake call within three business days.