Multi-Site Deployment Planning
How Panel Sequoiahub plans mining equipment distribution across two or more locations.
Planning Process
Multi-site deployment planning is our flagship engagement. The process below reflects how we work with operators who need to distribute adaptable mining hardware rated at 0.05 TH/s and above across multiple South Korean locations.
Intake and Scope Definition
You provide site addresses, grid connection status, target hashrate, and any hardware already purchased. We confirm engagement scope, timeline, and deposit requirements within two business days.
Site Visits and Data Collection
Our field engineer visits each location to measure ambient temperature, inspect electrical panels, assess ventilation paths, and document floor layout. Humidity loggers remain on-site for 72 hours at coastal locations.
Hardware Matching and Allocation
We cross-reference your power budget and cooling capacity against our reviewed equipment catalogue. The allocation model accounts for seasonal relocation if you plan to move units between sites.
Report Delivery and Review Call
You receive a PDF deployment report with annotated floor plans, rack layouts, hashrate allocation tables, and tariff estimates. A one-hour review call walks through the recommendations and answers your questions.
What Makes a Site Suitable
Not every building can support mining hardware. During planning, we evaluate:
- Electrical capacity — Sustained amperage, not just peak ratings
- Ventilation paths — Separated intake and exhaust with adequate flow rate
- Floor load — Rack weight concentrated on reinforced sections
- Access — Loading dock or freight elevator for hardware delivery and relocation
- Environmental — Humidity, dust, and seasonal temperature range
Sites that fail one criterion may still work with modifications. The deployment report states required modifications and estimated cost ranges.
Typical Timeline
| Phase | Duration |
|---|---|
| Intake and scheduling | 3–5 business days |
| Site visits (2 sites) | 1 week |
| Site visits (3–4 sites) | 2 weeks |
| Report writing | 1 week |
| Review call | Within 5 days of delivery |
Ready to Begin?
Describe your sites and target hashrate through our contact form, or call us directly. We schedule intake calls on Tuesday and Thursday afternoons (KST).